Проекты
 
Reference Project 1
:
Turkey / Truck Robotic Welding Production Line
 
Project
:
Robotic welding production line with 10 Robots
Budget
:
10.000.000 €
Team
:
11 Project Manager / 1 Project Controller / 4 Project Engineers / 6 Design Engineers / 7 Robot Experts / 6 Software Engineers / 40 Technicians
Project Contents
:
8 Welding Robots / 2 Hemming Robots / 60 Fixtures / 30 Conveyors / 7 PLC / 14 HMI

 


Reference Project 2
:
Ford Otosan Transit New Aluminium Hood Production Line
 
Project
:
New Aluminium Hood production line established with a new compact design
Budget
:
4.000.000 €
Team
:
1 Project Manager / 1 Project Controller / 4 Proct Enginerrs / 6 Design Engineers / 2 Design Engineers / 7 Robot Expers / 6 Software Engineers / 40 Technicians
Project Contents
:
5 SPR Handling Robots / 1 Table Top Hemming / 5 Fixtures / 4 Conveyors / 2 PLC / 3 HMI

 


Reference Project 3
:
Turkey / Bolu Arcelik Oven Production Line
 
Project
:
New Open Production Line Compatible with Industry 4.0
Budget
:
800.000 €
Team
:
1 Project Manager / 1 Project Controller / 2 Project Enginerrs / 3 Design Engineers / 1 Robot Experts/ 4 Software Engineers / 40 Technicians
Project Contents
:
1 Handling / 4 Lift / 10 Turn Table / 128 Conveyors / 2 PLC / 4 HMI

 


Reference Project 4
:
Turkey / Osmangazi Bridge Automation System
 
Project
:
5 gantries automation system and commissionig
Budget
:
900.000 €
Team
:
1 Project Manager / 1 Design Engineer / 2 Software Engineers / 10 Technicians
Project Contents
:
5 Gantries / 10 Elevators / 10 Platforms / 5 IM151-8F CPU / 5 HMI Mobile / 128 Sinamics Profinet Driver

 


Reference Project 5
:
Turkey / Paintshop Cataphoresis Line Automation System
 
Project
:
Cataphoresis Line, Conveyor and EMS Carriers Automation Project
Budget
:
1.150,000 €
Team
:
1 Project Manager / 2 Design Engineers / 3 Software Engineers / 20 Technicians
Project Contents
:
11 EMS / 44 Conveyors / 2 Elevators / 3 S7 319F CPU / 3 WinCC Scada V7.3 / 22 Movifit / Wireless Profinet

 


Reference Project 6
:
Turkey / Ford Otosan Paintshop New WAX Cabin and Conveyors
 
Project
:
Installation of new wax cabin with chiller system and 7 conveyors.
Budget
:
1.750,000 €
Team
:
1 Project Manager / 31 Design Engineer / 5 Software Engineers / 35 Technicians
Project Contents
:
WAX Cabin / Chiller System / 5 Conveyors / 2 CSC

 


Reference Project 7
:
Turkey / Bodyshop - Assembly Conveyor Automation System
 
Project
:
500 Conveyor Installation including transfer lines and buffer area Car tracking by RFID technology
Budget
:
1,450,000 €
Team
:
1 Project Manager / 1 Design Engineer / 2 Software Engineers / 15 Technicians
Project Contents
:
500 Conveyors / 4 Shuttle / 6 Elevators / 3 S7 319F CPU / 12 MP377 HMI / RFID

 


Reference Project 8
:
England / Bodyshop - Robotic Production Lines
 
Project
:
Total 50 Robots installation and commissionig with Rivet Guns
Budget
:
1.300.000 TL
Team
:
1 Project Manager / 10 Software Engineer / 15 Technicians
Project Contents
:
50 Robots / 20 Automatic Fixtures / 10 Allen Bradley CPU / 12 HMI

 


Reference Project 9
:
Turkey / Assembly Shop Production Line RTLS & RFID Automation System
 
Project
:
Sensing car locations bu using RTLS (Real Time Locating System) & RFID Technology both for offline and online areas
Budget
:
1.100.000
Team
:
1 Project Manager / 1 Design Engineer / 3 Software Engineer / 5 Technicians
Project Contents
:
1Smart Factory / RTLS & RFID System / 400 Active Tags

 


Reference Project 10
:
AGV
 
Project
:
Automated Guided Vehicle
Budget
:
R&D
Team
:
1 Project Manager / 2 Design Engineers / 2 Software Engineers / 5 Technicians
Project Contents
:
1 Electric Motor Drive System / 1 Power Steering System / 1 Opportunity Charging System / Lithium Battery

 

 

Нас рекомендуют
 
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering
Нас рекомендуют | ROBO Automation Electric Machine Engineering